Get In Touch

Wrasse climbing gourami amur pike Arctic char, steelhead sprat sea lamprey grunion. Walleye

Contacts
Location
523 Sylvan Ave, 5th Floor
Mountain View, CA 94041USA

Design of Water Treatment Facility

Design of Water Treatment Facility

This project was initiated in collaboration with a municipal water authority to plan, design, and engineer a state-of-the-art water treatment facility. The primary objective was to develop a sustainable and efficient facility capable of providing clean and safe drinking water to the community while addressing evolving water quality challenges.
Outcomes:
  • The establishment of a modern water treatment facility capable of providing safe and clean drinking water to the community.
  • Enhanced water quality and the removal of contaminants, ensuring compliance with stringent water quality standards.
  • Minimized environmental impact and sustainable practices integrated into the facility’s design and operation.
  • Regulatory compliance and permits secured for the construction and operation of the facility.
  • Community access to a reliable and sustainable source of clean water, improving public health and well-being.

Project Phases:

1. Needs Assessment and Site Selection:
  • Conducted a comprehensive needs assessment to understand the community’s water supply requirements and challenges.
  • Identified an optimal site for the water treatment facility, considering water source proximity and environmental factors.
2. Treatment Process Design:
  • Engaged in detailed design of the water treatment processes, including coagulation, flocculation, sedimentation, filtration, disinfection, and advanced treatment methods.
  • Implemented state-of-the-art technologies to address specific water quality issues and contaminants.
3. Environmental Impact Assessment:
  • Conducted an environmental impact assessment to ensure minimal ecological disruption during construction and operation.
  • Designed sustainable practices to reduce the facility’s carbon footprint and energy consumption.
4. Regulatory Compliance and Permits:
  • Navigated regulatory processes to secure the necessary permits and approvals for the construction and operation of the water treatment facility.
  • Ensured compliance with water quality standards and safety regulations.
5. Construction and Commissioning:
  • Managed the construction phase, overseeing the installation of water treatment equipment, pipelines, and control systems.
  • Conducted comprehensive testing and commissioning to verify the facility’s functionality and water treatment performance.
6. Operation and Maintenance Training:
  • Provided training to the water authority’s personnel to ensure effective operation, maintenance, and troubleshooting of the facility.
  • Developed protocols for routine inspections, maintenance, and quality control.
Open Project